Waterfront Trails Repair – Audley Road South, Hoile Drive and Ontoro Boulevard
Share Waterfront Trails Repair – Audley Road South, Hoile Drive and Ontoro Boulevard on Facebook
Share Waterfront Trails Repair – Audley Road South, Hoile Drive and Ontoro Boulevard on Twitter
Share Waterfront Trails Repair – Audley Road South, Hoile Drive and Ontoro Boulevard on Linkedin
Email Waterfront Trails Repair – Audley Road South, Hoile Drive and Ontoro Boulevard link
The Town is undertaking a capital project to repair a segment of the existing waterfront trail to address surface deterioration and improve overall safety and accessibility. Construction will begin in April 2026 between Audley Road South, Hoile Drive and Ontoro Boulevard.
For the duration of construction, public access to the waterfront trail will be temporarily closed at access points for Audley Road South, Hoile Drive and Ontoro Boulevard. This is to ensure public safety and to allow construction activities to proceed efficiently. Access will be reinstated once construction is complete.
Construction is expected to be completed by June 2026.
What to expect:
- Removal and replacement of damaged trail sections
- Base repairs as required
- Restoration of adjacent disturbed areas
Page published: 23 Mar 2026, 05:08 PM